The Beacon: September 2nd 2001

We were up at 5:30am (well, most of us), and had recovered from the previous day’s hilarious stall by about noon. As it got dark, we removed the sacking that we’d been using to black out the windows, and filmed some scenes outside the carriages. Finally it was up onto the roof for some cliched-but-fun action, with AJ on his injured leg, Josh and his fear of heights, and LJ and her rational realisation that running about on recently rained-on curved roofs in the dark is not a very safe thing to do. We left the site at midnight.

The Beacon: September 2nd 2001