The Dark Side of the Earth: February 1st, 2009

Post-production finally feels like it’s getting up to speed. Two students from the SAE – a college in Islington that I used to lecture at – have begun painting out puppeteers, just in low rez off-line shots for now, but the 2K scan should be done by next week, then they can really get cracking.
Meanwhile preparations are underway to build a miniature Swordsman and ceiling mechanism for shooting in late March along with the rest of the pick-ups.

The Dark Side of the Earth: February 1st, 2009