Undisclosed Project: Observation

Well, it’s all very real now. For six weeks I’ve been documenting my non-continuous prep period on a feature film adaptation of a well-known Shakespeare play. It won’t be announced to the press until it is close to release, so I still can’t share the title or any other identifying details. I’ll go so far as to say that it’s being shot in a theatre (though not all on stage), and the director is from a theatre background

On Monday I checked into the hotel and began the first of two full-time prep weeks. Unusually, these two weeks are filled with rehearsals. I may, once or twice, have worked on a film that had perhaps a single day of rehearsals. Two weeks is unheard of, but of course it’s perfectly normal in theatre.

The strange thing for me is that just when a scene is taking shape – the point where I’d normally get involved, when the blocking is nearly final and it’s time to think about shots – we move on to the next one. The last bit of the rehearsals will be done, as normal, on the day of shooting.

As the actors explore the spaces, I do too. Some of them have changed quite dramatically, thanks to the efforts of the art department, since I last reccied them. It’s an unprecented opportunity for me to check many potential camera angles. Before we move on from a scene, I run around frantically with Artemis, trying to take enough shots to make a storyboard. A large part of today (it’s Saturday as I write this) has been taken up with selecting the best shots, scribbling annotations on them and outputting them as PDFs into a Google Drive folder where the director, 1st AD, 1st AC, production designer and others can see them.

During quieter moments, I’ve slipped off to discuss things with the production designer or the stage lighting designer, or just to sit in one of the spaces by myself and think through shots and lighting.

On Friday afternoon a tech recce took place, which I led because the director was still busy rehearsing. This was followed by a Zoom meeting to discuss issues arising.

Less fun but equally important things last week were completing a camera department risk assessment, and taking Covid tests, which leave you feeling like you jumped into a swimming pool without pinching your nose.

Undisclosed Project: Observation

Undisclosed Project: Organisation

By the time you read this I will have entered the Covid bubble for the still-as-yet-unannounced Shakespearian film, the beginning of two weeks of full time prep before cameras finally roll.

The week just gone has been something of a calm before the storm. It started with two important Zoom meetings: one about practicals, the other about the schedule.

The first meeting involved going through all the locations with the production designer explaining what practical lamps he planned to put in each, and me sometimes asking for additional ones. Practicals are going to be a big part of our lighting, and this sort of collaboration with the art department can make a real difference between a smoothly-running shoot and a world of pain wherever you’re trying to hide film lights because you don’t have enough practical sources.

The second meeting, coming shortly after I saw the shooting schedule for the first time, was an in-depth discussion of it with the director, producer, line producer and 1st AD. Most of my concerns – other than some days which felt uncomfortably heavy, and even one or two that seemed wastefully light – were around times of day and equipment. For example, one daylight interior scene was scheduled for the end of day, when we might be losing the light. (The next day I went through it all again by myself and made sure that any night scenes scheduled for daytime could be reasonably done with blacked-out windows.)

We also talked a lot about how things could be rejigged to get as much value as possible out of the two days that we have the crane. It’s expensive, and no-one wants it sitting around while we shoot little dialogue scenes in tiny rooms. Nor do I want one or two scenes in the film to have lots of crane shots and the rest to have none; a sprinkling of them throughout the film would be preferable, though it would mean lots of costume and make-up changes.

Another draft of the script was issued , with pretty minor changes, though one extra room has been introduced, so that will need a proper recce next time I’m there. Reading through a new draft and updating my notes takes the best part of a day, and though it can sometimes feel like a chore, every reading helps me understand the story and characters better.

I did a little more shot-listing later in the week, but it will be much better and easier to do this at the rehearsals over the next fortnight, when I can see how the actors are approaching their characters and how they’re going to use the spaces. I can even take Artemis photos if it doesn’t interrupt their process too much. Roll on rehearsals!

Undisclosed Project: Organisation

Undisclosed Project: Experimentation

The main event of last week’s prep was a test at Panavision of the Arri Alexa XT, Red Gemini and Sony F55, along with Cooke Panchro, Cooke Varotal, Zeiss Superspeed and Angenieux glass. More on that below, along with footage.

The week started with Zoom meetings with the costume designer, the make-up artist, potential fight choeographers and a theatrical lighting designer. The latter is handling a number of scenes which take place on a stage, which is a new and exciting collaboration for me. I met with her at the location the next day, along with the gaffer and best boy. After discussing the stage scenes and what extra sources we might need – even as some of them were starting to be rigged – I left the lighting designer to it. The rest of us then toured the various rooms of the location, with the best boy making notes and lighting plans on his tablet as the gaffer and I discussed them. They also took measurements and worked out what distro they would need, delivering a lighting kit list to production the next day.

Meanwhile, at the request of the producer, I began a shot list, beginning with two logistically complex scenes. Despite all the recces so far, I’ve not thought about shots as much as you might think, except where they are specified in the script or where they jumped out at me when viewing the location. I expect that much of the shot planning will be done during the rehearsals, using Artemis Pro. That’s much better and easier than sitting at home trying to imagine things, but it’s useful for other departments to be able to see a shot list as early as possible.

So, the camera tests. I knew all along that I wanted to test multiple cameras and lenses to find the right ones for this project, a practice that is common on features but which, for one reason and another, I’ve never had a proper chance to do before. So I was very excited to spend Wednesday at Panavision, not far from my old stomping ground in Perivale, playing around with expensive equipment.

Specifically we had: an Arri Alexa – a camera I’m very familiar with, and my gut instinct for shooting this project on; a Sony F55 – which I was curious to test because it was used to shoot the beautiful Outlander series; and a Red Gemini – because I haven’t used a Red in years and I wanted to check I wasn’t missing out on something awesome.

For lenses we had: a set of Cooke Panchros – again a gut instinct (I’ve never used them, but from what I’ve read they seemed to fit); a set of Zeiss Superspeeds – selected after reviewing my 2017 test footage from Arri Rental; a couple of Cooke Varotal zooms, and the equivalents by the ever-reliable Angenieux. Other than the Angenieux we used on the B-camera for The Little Mermaid (which I don’t think we ever zoomed during a take), I’ve not used cinema zooms before, but I want the old-fashioned look for this project.

Here are the edited highlights from the tests…

You’ll notice that the Sony F55 disappears from the video quite early on. This is because, although I quite liked the camera on the day, as soon as I looked at the images side by side I could see that the Sony was significantly softer than the other two.

So it was down to the Alexa vs. the Gemini, and the Cookes vs. the Superspeeds. I spent most of Thursday and all of Friday morning playing with the footage in DaVinci Resolve, trying to decide between these two pairs of very close contenders. I tried various LUTs, did some rough grading (very badly, because I’m not a colourist), tested how far I could brighten the footage before it broke down, and examined flares and bokeh obsessively.

Ultimately I chose the Cooke Panchros because (a) they have a beautiful and very natural-looking flare pattern, (b) the bokeh has a slight glow to it which I like, (c) the bokeh remains a nice shape when stopped down, unlike the Superspeeds’, which goes a bit geometric, (d) they seem sharper than the Superspeeds at the edges of frame when wide open, and (e) more lengths are available.

As for the zoom lenses (not included in the video), the Cooke and the Angenieux were very similar indeed. I chose the former because it focuses a little closer and the bokeh again has that nice glow.

I came very close to picking the Gemini as my camera. I think you’d have to say, objectively, it produces a better image than the Alexa, heretical as that may sound. The colours seem more realistic (although we didn’t shoot a colour chart, which was a major oversight) and it grades extremely well. But…

I’m not making a documentary. I want a cinematic look, and while the Gemini is by no means un-cinematic, the Alexa was clearly engineered by people who loved the look of film and strove to recreate it. When comparing the footage with the Godfather and Fanny and Alexander screen-grabs that are the touchstone of the look I want to create, the Alexa was just a little bit closer. My familiarity and comfort level with the Alexa was a factor too, and the ACs felt the same way.

I’m very glad to have tested the Gemini though, and next time I’m called upon to shoot something great and deliver in 4K (not a requirement on this project) I will know exactly where to turn. A couple of interesting things I learnt about it are: (1) whichever resolution (and concomitant crop factor) you select, you can record a down-scaled 2K ProRes file, and this goes for the Helium too; (2) 4K gives the Super-35 field of view, whereas 5K shows more, resulting in some lenses vignetting at this resolution.

Undisclosed Project: Experimentation

Undisclosed Project: Elevation

Prep for the yet-to-be-announced Shakespearian feature continued last week. Tuesday and Wednesday saw me on Zoom calls with the producers – discussing camera kit quotes – and the costume designer. “Will we see enough of his face through this headgear?” was a question for the latter. She in turn asked how white a white coat should be, and how dark surrounding characters should be to make one person in black stand out. Difficult things to quantify, but important.

The week’s main event was another two-day recce with the director and production designer. The designer had produced beautiful and detailed mood-boards for every room, and had even started to bring in the right furniture and test paint colours. The main aim of the recce was to discuss and sign off on his decisions so that decoration and dressing could step up to full steam.

As we moved from room to room, trying to keep in story order whenever possible, the director revealed lots of his thoughts about the tone and key beats of each scene. I was pleased to find that these were largely in a similar vein to notes I had amassed on my own spreadsheet. And when they weren’t in sync, that was very useful to know at this stage! For most scenes I showed him a reference image or two, again from my spreadsheet, to double-check that we were on the same page.

We were visited during the recce by a grip who had come to see whether a crane would fit into our main location, and if so what kind of crane and whether it could achieve the shots we wanted. I had envisaged using a Giraffe like the one we had on The Little Mermaid, but the grip suggested we would be much better off with a 23ft Technocrane and a basic remote head, as this can telescope and retract rather than only sweeping around in an arc. We measured the distances to see where the camera could end up, and then I used Artemis Pro – a director’s viewfinder app – to see what framing that would translate to with various lenses. One of our most important shots should just be possible at the full extent of the arm, combined with the full range of a 25-250mm zoom.

Whether the budget can afford the crane, however, is yet to be confirmed. This week I am due to conduct camera and lens tests, and once I’ve made a decision on those then we will know what is left for fancy grip equipment!

The only other thing to happen last week was the hiring of a data wrangler. Since I lined up the 1st and 2nd ACs quite soon after my own hiring, the camera department is now complete.

Undisclosed Project: Elevation

20 Years of Blogging

Today is the 20th anniversary of my first ever blog post. On March 4th, 2001 I wrote the inaugural “journal” entry on the-beacon.com, a website about a terrible no-budget action move I was writing, directing, producing, etc, etc. (clip below). My blog continued across two other project-specific websites for the next few years before they all got integrated into neiloseman.com in 2011.

There is a history of my blogging exploits in my 1,000th post from January 2015, and if you’re interested in blogging yourself, I shared some tips not long afterwards. (The post you’re reading now is the 1,261st, in the unlikely event that you care.) If you visit the Blog Archive page you can delve back into my old posts, either by month and year, by production or by topic.

It is strange to think how different the world was when I wrote that first post. The Twin Towers were still standing. Buying a take-away latte was swanky and cosmopolitan. Ordering something remotely meant getting a catalogue, then filling in a form and posting off a cheque and waiting up to 28 days. Your choice of filming formats came down to celluloid or standard definition DV. Everyone still took their holiday snaps on 35mm. The internet was all dial-up. VHS was still the dominant home video format, though DVD was on the rise. “Netflix” was probably something fishermen did. Superhero movies were rare. Flat screens and touch-screens were a sci-fi dream. I for one didn’t own a mobile phone. There was no social media. The term “blog” had been coined but wasn’t widely known. And the idea of a pandemic shutting down the world for a year, keeping us from our loved ones and making us all mask up in Tesco’s was utterly inconceivable.

Blogging has certainly been useful to me. It helps me to organise my thoughts, and I frequently check my old posts to remind myself how I did something so that I can repeat the trick… or avoid making the same mistake again! It’s even got me work, writing for RedShark News since 2017 – a website edited by none other than Simon Wyndham, fight choreographer for that blog-starting film of mine, The Beacon. That in turn has led to me writing for British Cinematographer magazine since the end of last year.

It’s quite fitting that now, as back in March 2001, I am prepping for a feature film, and sharing that process on this blog (albeit in vague terms, as the project hasn’t been officially announced yet). The budget may be a tad bigger, and I may only be DPing rather than doing pretty much all the major jobs myself, but some things haven’t changed; in my second ever post, I complained about my main location being closed due to a disease outbreak…

20 Years of Blogging

Undisclosed Project: Iteration

I continue to saturate myself in the script for the yet-to-be-announced Shakespearian film. Some other little projects I had going on have now wrapped up, leaving me free to concentrate purely on this production, which is due to start shooting a month from now.

I spent the best part of last Monday reading a new draft of the screenplay and updating my spreadsheet of notes to reflect the changes. Going back over this spreadsheet and the script and re-evaluating them from different angles formed a signficant part of the rest of the week. On Thursday, for example, I focused on the swordfight (narrows it down, Shakespeare fans!), scouring YouTube for reference videos and noting which camera angles seem most dangerous and engaging. In fact, watching references was another big part of the week. I worked my way through the whole Godfather trilogy (above), some more episodes of Servant, bits of several action movies that have a specific type of night exterior, and a couple of the lead actor’s recent films, to see how other DPs have lit and lensed him.

At the end of the week I went back over the spreadsheet and filled in at least one idea for every scene that did not yet have an entry in its “camera” or “lighting” column. Sometimes this would be an idea for a specific shot – e.g. “angle from outside the window looking in”; sometimes it would be a general vibe for the camerawork – e.g. “close, handheld, intimate”; sometimes a specific source – e.g. “soft top-light rigged to ladder”; sometimes a more general lighting note – e.g. “group in a patch of light, surroundings dark”.

Production sent over the quotes they have received for my camera list. At least one of them was within the budget, so that’s good! This week I’ll discuss that with the producers and hopefully decide which rental house we’re going with.

Speaking of equipment, a cheap novelty optical item arrived from eBay. I used this and my iPad to shoot a very rough demonstration of how we might achieve a special effect in camera, sending the video to the director for his feedback. He liked it, and wants to add in a few more instances of it throughout the film.

Another idea I proposed was a lighting effect, for which I sent the director this video I’d found online (below). I don’t intend to do something exactly like this in the film, but I saw a way it could be modified to our story. I ended up shooting my own rough test that is closer to how I see it working in our film.

Less exciting than any of the above, but very important, was taking an online Screenskills course in Covid awareness. I’d done the Basic Awareness course already, which takes about 30 minutes including a brief quiz, but Screenskills were offering free places for HoDs on a more in-depth course, so I signed up. This consisted of a three-hour presentation about the virus, how it can spread on set and what can be done to mitigate it in various departments, followed by another quiz. I learnt a few new things and my awareness was indeed raised.

Undisclosed Project: Iteration